Category
Marine Construction
Civil Construction
Client
Maryland Port Administration
Location
Baltimore Harbor
Baltimore, MD
Key Challenges & Project Details
- Project consisted of removal of two piers at the abandoned Maryland Shipyard and Drydock site
- Required removal of one pier to mud line
- Required removal of superstructure of second pier
- Required removal of part of old drydock breasting piers, consisting of concrete decks and concrete fill monopiles, as well as various barges and other breasting structures
- Materials removed consisted of 80,000 SF of concrete, steel and timber piers
- Project required that all debris be prepared off site for delivery to approved HAZMAT certified landfill
- All materials transported from site by barges to disposal preparation area
- At preparation area, material was unloaded from barges and reloaded onto trucks for shipping to certified hazardous material disposal site
- All work completed in strict adherence to rigorous HAZMAT and safety standards
- Work completed in a tight time schedule due to impending follow-up phases of construction
- Additional challenge - substantial portion of removal work had to be carried out under water
- Project completed ahead of schedule and under budget
- Project completed with no recordable or lost time injuries