Category
Marine Construction
Pier/Wharf Construction
Pile Driving
Client
State of Delaware
Department of Natural Resources
Location
Kent County, DE
Key Challenges & Project Details
- Project consisted of construction of a fishing pier, 360 feet in length and 12 feet wide
- Pier constructed in Delaware Bay, with exposure to wind, waves, and commercial ship traffic
- Shallow water at this site created a challenge for placing necessary floating equipment
- Shore cofferdam was constructed to allow crane access onto a sunken barge to construct the inshore section of the pier
- Sunken barge also used as a breakwater and staging area for concrete form crew
- Offshore portion of the pier constructed from a floating crane barge
- Pier constructed entirely of cast in place concrete through severe winter weather
- All work completed on time for spring opening, even with the addition of a substantial change order by the owner
- Project completed with no recordable or lost time injuries